RESIDENTIAL ASPHALT DRIVEWAY PAVING IN TORONTO AND THE GTA

Asphalt Driveways - Where Beauty Meets Functionality

Pavemar Paving is the best paving company in Toronto for your residential paving needs.

95% of our residential projects can be completed within one day.

Whether we are Replacing, Resurfacing or Reshaping your asphalt driveway, we ensure to create the best solution for your home.

Continue scrolling down this page to see some of our recent work or fill out our form below to get some expert advice and a free quote!

Pavemar Paving Residential Driveway Drone Image

CONTACT FORM

RECENT RESIDENTIAL ASPHALT PROJECTS

Asphalt Driveway on Stouffville Estate | Pavemar Paving

Stouffville Estate Driveway

This custom asphalt driveway has two coats of asphalt for industrial strength. The top coat was installed in one-shot on a warm summer day for an optimal finish.

North York Asphalt Driveway | Pavemar Paving

North York Laneway Driveway

Waterproofing repairs along the foundation of this home required this driveway to be completed in two phases. Watch this video to learn more.

Shared Asphalt Driveway in Markham Ontario | Pavemar Paving

Shared Asphalt Driveway in Markham

Rather than cutting the old driveway down the property line, both neighbours agreed it was time to replace the driveway in its entirety.

Driveway Resurfacing in Aurora Ontario | Pavemar Paving

Driveway Resurfacing in Aurora

The old asphalt on this property acted as a strong base layer for our asphalt resurfacing and saved the client from going over budget on this renovation.

Asphalt Driveway in Uxbridge Ontario | Pavemar Paving

Custom Driveway Design in Uxbridge

This property demanded a driveway design that keeps movement in mind to accommodate this client's needs.

Residential Asphalt Driveway in Toronto Ontario | Pavemar Paving

Asphalt Driveway in Toronto

Interior renovations on this home caused the original driveway to experience wear and tear from heavy contractor use. Nothing like a fresh layer of asphalt to make the outside of this home look just as good as it does on the inside.

U-Shaped Asphalt Driveway in Mississauga Ontario | Pavemar Paving

U-Shaped Driveway in Mississauga

In collaboration with the landscaper on this project we laid a U-shaped driveway that met up seamlessly with their new interlocking bricks leading into the home.

RESIDENTIAL ASPHALT BLOGS

Residential Asphalt Driveway Paving in Markham | Pavemar Paving

Standard Driveway Replacement Process in Ontario & How To Spot a Scam!

October 28, 20245 min read

Standard Driveway Replacement Process in Ontario & How To Spot a Scam!

Okay, so you're interested in getting your asphalt driveway redone, but every contractor you call seems to have a different story about the process, and you’re left wondering what’s true. Sound familiar? We’re here to clear things up. This guide will walk you through the real standard driveway replacement process in Ontario and help you spot common scams.

–Understanding each step will not only help you recognize quality workmanship but also flag red flags when hiring a contractor.

Step 1: Initial Consultation and Quote

  • What to Expect:
    It all starts with a call and then a consultation. The contractor will inspect your existing driveway and provide a budget price followed by an on-site inspection.

  • Avoiding Scams:

    • Watch out for door-to-door salesmen offering “leftover asphalt” deals. These “deals” usually leave you with a driveway worse than the one you started with.

    • The on-site consultation should include a conversation about materials, scope of work, budget, and a clear timeline.

    • Be cautious of contractors who put up a yard sign on your property right after the first meeting. It might mean they’ll tear up your driveway but then delay finishing it until they can drum up enough business in your area to make it worth their time.

    • Beware of high down payments, especially after the driveway is ripped out. Reliable contractors in Toronto usually don’t require upfront payments for standard driveway jobs. In fact, Pavemar Paving gets 50+ calls per year to complete work abandoned by unreliable contractors who took off with a down payment after they removed the asphalt.

    • Check reviews! Look for a good history of genuine reviews to ensure you’re hiring a reputable company.

    • Ensure the company you are dealing with is truly who they say they are...In the past we've been impersonated by lowlife companies trying to piggyback off of our 30+ year reputation.

      Scam
    • Watch for business emails ending in “@gmail.com” or “@hotmail.com.” and etc... If a company doesn’t even spend $8 per month to have a custom business email...it could mean that they change their contact info often or that they don't care to reinvest in their business

    • Lastly, avoid quotes that seem too good to be true—they usually are.

Step 2: Demolition and Removal of Old Driveway

  • What to Expect:
    The old asphalt or concrete will be broken up and removed, leaving a clear base for your new driveway.

  • Pro Tip:
    Make sure your contractor is clear about whether they’re doing a full replacement or just a resurface. If it’s a full replacement, the old asphalt should be removed completely before paving. Resurfacing over damaged layers can lead to problems down the line and often times you'll get less asphalt than you need.

Asphalt Driveway Demolition and Removal | Pavemar Paving

Step 3: Preparing the Base Layer

  • What to Expect:
    The sub-grade of gravel should be compacted and inspected for flexing under weight by more than 30mm.

3/4 Concrete Crush Stone Base for Driveway | Pavemar Paving
  • Key Checkpoint:
    Most driveways in Toronto have been around for over a decade and the sub-grade has settled through numerous freeze-thaw cycles. Typically, you can pave the same day the asphalt is removed. However, if you notice water coming up onto your old driveway or wheel ruts in excess of 4 inches, extra care may be needed, including full excavation and gravel replacement.

  • Avoiding Scams:
    95% of driveways don’t need to be left open to "settle" after the old asphalt is removed. If your sub-grade wasn’t in poor condition, a contractor claiming it needs weeks to settle is likely stalling or trying to gain some free advertising by sticking their yard sign in your lawn until they show.

Step 4: Grading and Slope Adjustment

  • What to Expect:
    The contractor will grade the base to ensure proper water drainage, creating a slight slope away from your home when possible.

Expert Grading with Slope for Water Drainage on Driveway | Pavemar Paving

  • Pro Tip:
    Ask about grading plans during the consultation to ensure your contractor knows what they’re doing. Pavemar Paving uses rotary laser levels to ensure proper drainage on projects with demanding slope requirements.

Step 5: Installing the Asphalt Layer

  • What to Expect:
    Hot asphalt is poured and spread evenly over the base. It’s then compacted with a roller to create a smooth, durable surface.

  • Quality Indicator:
    A standard driveway should have at least 2 inches of compacted asphalt for optimal strength and durability. We always lay a minimum of 3 inches of asphalt out of the spreader and our rollers compact it to an average of 2.25 inches - the same thickness as an interlocking brick.

Asphalt Driveway Paving in Toronto | Pavemar Paving

Step 6: Final Rolling and Finishing Touches

  • What to Expect:
    The surface is rolled again to ensure a smooth, even finish.

  • Avoiding Scams:
    If a contractor rushes through this step, it’s a red flag. Proper finishing is key for long-term performance.

Step 7: Curing and Setting Time

  • What to Expect:
    Your new driveway needs about 24-48 hours to set, so keep it clear of vehicles or heavy equipment during this time.

  • Maintenance Tips:
    Avoid parking heavy vehicles on the driveway for at least a week to ensure it fully cures.

  • In the warmer months it's important to avoid dry steering your tires on your freshly paved driveway, even after the first 48 hours, to avoid tire scuffs. Although tire scuffs may cause concern, they are superficial imperfections that do not impact the structural integrity of your driveway. Most tire scuffs wear away within the first year of installation and you won't even be able to tell where they were.

Step 8: Clean-Up and Inspection

  • What to Expect:
    The contractor should clean up the site and remove any debris. A final inspection will ensure that the job meets your expectations.

  • Pro Tip:
    Ask if the company uses a power sweeper. Driveway replacement is a heavy-duty job, and proper cleanup is crucial to avoid a lingering mess.

Municipal Paving in Markham Ontario | Pavemar Paving

Understanding the standard driveway replacement process can help you make informed decisions and avoid potential scams. If a contractor skips steps, rushes the job, or refuses to provide clear details, consider it a red flag. Reliable contractors are transparent, professional, and committed to quality work. At Pavemar Paving, we take every step seriously to ensure your driveway is built to last. Ready to start? Reach out today for a free consultation!

Back to Blog

RESIDENTIAL PROJECTS

Read More

Your residential driveway serves as the gateway to your home, leaving a lasting impression on those passing by.

At Pavemar Paving, we understand the importance of a well-paved driveway and its impact on your property's value. With our top-of-the-line equipment and skilled staff, we can provide exceptional residential driveway paving services in Toronto and the Greater Toronto Area (GTA).

From the initial consultation to the final touches, our experienced team will handle every aspect of your project with utmost care and precision.

We take pride in our extensive years of experience and unwavering commitment to delivering optimal customer service.​Regarding driveway paving services in Toronto and the GTA, trust Pavemar Paving to create a stunning and durable entrance to your home. Contact us today to discuss your project, and let us bring your vision to life.

WHY CHOOSE ASPHALT DRIVEWAYS? 

Asphalt is a popular choice among homeowners for driveways due to its durability and cost-effectiveness. Many companies use recycled asphalt for the base layer, which is environmentally friendly and more affordable than fresh asphalt. These factors make asphalt the ideal material for your driveway.

SEAMLESS FINISH

You don’t need to worry about compromising the aesthetic appeal of your property as asphalt gives a seamless finish.

DURABLE

Asphalt is known to withstand harsh weather conditions and natural elements better than other materials and is less likely to get damaged easily.

EASY TO MAINTAIN

It is an easy-to-manage option as it requires little maintenance and stays intact for extended periods.

COST-EFFECTIVE

This is one of the primary reasons why asphalt is a preferred choice among homeowners. 

FLEXIBLE

Asphalt is more flexible than concrete, making it less vulnerable to significant cracking.

Asphalt paving is performed by contractors who specialize in the job. Pavemar Paving has the necessary equipment and techniques to do the job right the first time. Get a free quote now.

FREQUENTLY ASKED QUESTIONS

SHOULD I OPT FOR AN ASPHALT OVERLAY?

"Asphalt overlay" or "Resurfacing" refers to paving asphalt on top of existing asphalt. It is generally done after comprehensively examining your current asphalt pavement for cracks, faults, or problem areas. If your pavement is in good condition, the top layer is removed for improved grip and a fresh layer of asphalt is laid on top. Sealing may be ideal if your existing asphalt is in good shape but needs renewal.

WHICH IS BETTER, A COLD MIX OR A HOT MIX?

Cold mix asphalt is typically used in the off-season or for minor repairs. We employ hot mix asphalt most of the season for optimal results.

DO I TREAT MY RECENTLY FINISHED ASPHALT PAVEMENT?

Asphalt aftercare requires you not to use or drive over it for 24-48 hours. The duration is longer for hotter seasons. It should be followed with the standard regular seal coating and resurfacing maintenance.

WHAT IS THE EXPECTED LIFESPAN OF A NEW ASPHALT DRIVEWAY?

A homeowner can expect the driveway to last 30 years or longer if they use good products. Many projects can survive 40 to 50 years if properly maintained. Regular maintenance and vigilant care of your pavement or parking lot can considerably extend your property's life.

BOOK OUR SERVICE

Let our  professional paving contractors assess your property in person.

Get In Touch

Hours

Mon – Fri 7:00am – 5:00pm

Sat – Sunday 7:00am – 9:00pm

Business Address:

82 Russell Jarvis Dr,

Markham, Ontario L3S 4B1

Service Area:

Toronto, Markham, Woodbridge, Richmond Hill, Newmarket, Brampton, Pickering, Ajax, Whitby, Burlington, Milton, Oakville, and Uxbridge.

Phone Number:

(416) 292-9050

Google Reviews:

@pavemarpaving

Pavemar Paving Logo

Copyright 2025 . All rights reserved.