For over 30 years, we’ve helped businesses and property owners in Oakville, Burlington, and Hamilton improve their sites with durable, long-lasting paving and concrete solutions designed for high-traffic use.
Our team specializes in commercial parking lot paving, asphalt resurfacing, concrete work, and large-scale repairs throughout these communities and the surrounding region.
As established and fast-growing areas with demanding infrastructure needs, Oakville, Burlington, and Hamilton require careful planning, precision, and professionalism on every project. We deliver work that meets regulatory standards, stays on schedule, and minimizes disruption to your day-to-day operations.
Scroll down to view our recent projects in the area, or fill out the form below to request a free quote and schedule your next paving project today.

At the Canada Centre for Inland Waters (CCIW) in Burlington, Pavemar Paving recently wrapped up a tight-turnaround asphalt job for Bronte Construction. This was no ordinary paving task—the challenge was to repave a nearly level a section of asphalt adjacent to a new concrete drainage system, all while working under strict slope and compaction requirements. Read the full blog here.

Pavemar completed the restoration of two raised walkway sections at this GO Transit bus station after the existing concrete became beyond repair. The bus station stayed open for the duration of the project and we managed the traffic flow with a phased approach. Pavemar Paving is currently PTS certified and this is one of many Metrolinx Projects we have proudly contributed our expert services to.

As part of this tendered Walmart project, Pavemar was contracted to complete the asphalt paving scope. All work was executed to spec, including milling, sweeping, asphalt adhesive application, and ensuring uniformity during the installation of both base and top asphalt layers. The area between the old asphalt and new speed bumps were routed and sealed with hot rubberized seam filler before the day was out - leaving the speed bumps ready for daily 18-wheeler traffic abuse.